Analysis on Dead Ship Starting Scheme for Power System of a Semi-submersible Drilling Platform
Chen Kuiying1,2,Liu Lingshun1,Xu Gang2 (1.Naval Aeronautical and Astronautical University,Yantai 264001,China;2.Yantai CIMC Raffles Shipyard Co.,Ltd,Shandong 264000,China)
In this paper,the power system structure of drilling platform is proposed,and two different schemes for the starting of "paralyzed ship" of the Brazilian drilling platform are expounded.The feasibility and superiority of the spare scheme are explained,which can ensure the quick recovery of power system and normal operation within the prescribed time and ensure personnel and equipment safety on the drilling platform.
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.